| MOQ: | Negotiable |
| Price: | Negotiable |
| Payment Terms: | TT |
Before installation, it is necessary to confirm the bearing capacity of the building structure, and the spacing between supports and hangers should comply with the specifications (horizontal section ≤ 2m, vertical section ≤ 1.5m). When laying cables, it is necessary to avoid sharp bends and use specialized bending fittings at turning points. In corrosive environments, steel cable trays require hot-dip galvanizing process (zinc layer thickness ≥ 65 μ m) or epoxy resin coating; In humid environments, drainage holes should be installed to prevent water accumulation. It is worth noting that the bridge system needs to be reliably connected to the grounding grid, and the cross-sectional area of the jumper wire should not be less than 4mm ² to prevent static electricity or leakage risks.
| Attribute | Specification |
|---|---|
| Appearance | Smooth |
| Corrosion Resistance | High |
| Installation | Wall-mounted/Floor-mounted |
| Side Rail Height | 30-500mm |
| Application | Indoor/Outdoor |
| Finish | Hot-dip Galvanized |
| Installation Method | Screws |
| Load Capacity | Light/Medium/Heavy Duty |
The Galvanized Cable Ladder System efficiently manages and supports cables in various industries including telecommunications, power distribution, and construction. Its corrosion-resistant design makes it ideal for outdoor applications exposed to rain, snow, extreme temperatures, and corrosive environments.
![]()